Project Overview

• Mechanical fitout for 64 number apartments with Exhaust air heat pumps, boosted cold water from the communals, semi rigid ducting from the EAHP, hot and cold water to all appliances in soldered copper, fusion weld soils and wastes and provision of fire extinguishers.

• Communal services including a sectional cold-water tank for each block, three stage Wilo booster, UV water filtration, water metering, trace heating of boosted cold pipework and communal fire extinguishers.

• Fusion weld soils and wastes.

• Dry riser with inlet valve and cabinet and landing valves and cabinets serving the landing of each block.

• BMS controls for each block controlling communal services and monitoring cold water usage with remote login via a front-end PC networked to all panels with a fibre network system.

• Communal cold-water services serving the riser were carried out offsite during the lockdown period to keep on schedule with the programme using the coordinated Revit model and us producing our own workshop drawings for offsite fabrication.

• Mechanical fitout for 14 number semi-detached houses with Exhaust air heat pumps,340 litre submersible booster cold water storage tanks, semi rigid ducting from the EAHP, hot and cold water to all appliances in soldered copper, fusion weld soils and wastes and provision of fire extinguishers.