Barnwell Point, Hansfield

This was a fast-paced project (64 weeks) for our client Fajon Construction located in the Barberstown area of Dublin.  The scheme consisted of 235 apartments and 12 townhouses over 3 blocks each with two cores, the blocks ranged   from five floors to seven floors high.

Works consisted of:

  • Heating generated within the plantroom using Hamworthy Wessex Modumax gas boiler systems and is circulated and distributed around a piped heating network within the carpark and each riser to each apartment via a Wilo triplex circulating pump arrangement within the plantroom
  • Each apartment is fitted with a Danfoss heat interface unit
  • Each apartment is ventilated using a Vent Axia sentinel Kinetic plus MVHR unit
  • Each apartment is provided with cold water from a communal 70,000 litre cold water storage tank
  • HDPE fusion weld soild and rainwater pipework throughout the building
  • Full BMS control system to monitor and control all of the communal plant within both the plant room and tank room
  • A gas detection system to monitor for both natural gas and carbon monoxide within the plantroom
  • Automatic pressurisation unit & expansion for the heating system
  • Stainless steel flues for the Boiler, CHP and electrical generator from the ground floor plant room to the roof level
  • Bin store extract ventilation including fire dampers
  • Cleaners store ventilation including fire dampers
  • Electrical generator ventilation including fire rated ducting, fire smoke dampers, control panel and intake/exhaust louvres
  • Boosted CAT 5 system to supply bin store taps and irrigation taps for the first floor podium greenery areas above the carpark
  • Underground fusion weld MDPE gas pipework from the GNI gas meter skid to the plantroom
  • Apartment flatpack MVHR ductwork, CWS and soils pipework
  • Versatile Radik compact radiators and chrome towel rails for each of the apartments

Mariners Way

•Aereco Demand Control Ventilation

• Glow-Worm Hugh Efficiency Gas Boiler

• EPH Controls

Shoreline, Baldoyle

McGuinness Plumbing undertook the full Mechanical Package for Richmond Homes Ltd in the exciting new development Bay View at The Coast, Baldoyle.

• Mitsubishi Air Source Heat Pump

• Aereco Demand Controlled Ventilation system

• DAB Booster Pump

• Domus Ventilation

• Unmak Radiators

St Marnock’s, South Side

Houses comprise air source heat pump with plan radiators, while the apartments and duplexes are exhaust air heat pump with plan rads and chrome towel rails, DCE Ventilation.

• Panasonic Heat Pump

• Vent Axia MVHR

• Grundfos Water Pump

• EPH Heating Controls

• Stelrad Radiators

 

 

Sika Woods, Phase 2

• All bathrooms and en-suites fitted with high quality sanitaryware by sonas

• Luxury bath and shower mixer and handset

• Thermostatically controlled high-pressure showers

• Dual flush WC cisterns

• Sonas Chrome heated towel rails

• Dikon Environmentally friendly A-Rated Air to Water Heat Pump

• EPH Electronic time clock for heating and hot water

• Unmak Contemporary style radiators with individual thermostatically controlled valves

• Vent Axia Mechanical heat recovery ventilation system

• Unitherm Underfloor Heating

Berford, Duleek

• High Quality Ideal Standard Sanitary Ware

• Contemporary shower door/enclosure and bath screen by Ideal Standard

• Crystal Straight Chrome heated towel rails in all bathrooms and the downstairs WC

• Type LD2 Fire detection system

• Aereco low energy demand driven mechanical extract ventilation system

• High Efficiency Glow-worm Gas Boiler System with 3 zone programable heating controls

• External water tap point in rear garden

Lispole Court

• installation of a Joule Exhaust air heat pump

•heating controls

• Joule compact steel radiators,

• associated ductwork for the Joule EAHP system

• Joule BOSS centralised controller

• Tricel cold water tank

• Wilo twin head cold water booster

• Communal and external rainwater pipework

Strand Road, Bray

• X4 One bed Apartments

• x31 Two Bed Apartments

• x4 Three Bed Apartments

• Exhaust Air Heat Pumps

• Stylish radiators

• smoke ventilation

• dry-riser

• slung drainage

• centralised boosted cold water

DCC Bunratty, Social Housing Bundle

• Mechanical fitout for 64 number apartments with Exhaust air heat pumps, boosted cold water from the communals, semi rigid ducting from the EAHP, hot and cold water to all appliances in soldered copper, fusion weld soils and wastes and provision of fire extinguishers.

• Communal services including a sectional cold-water tank for each block, three stage Wilo booster, UV water filtration, water metering, trace heating of boosted cold pipework and communal fire extinguishers.

• Fusion weld soils and wastes.

• Dry riser with inlet valve and cabinet and landing valves and cabinets serving the landing of each block.

• BMS controls for each block controlling communal services and monitoring cold water usage with remote login via a front-end PC networked to all panels with a fibre network system.

• Communal cold-water services serving the riser were carried out offsite during the lockdown period to keep on schedule with the programme using the coordinated Revit model and us producing our own workshop drawings for offsite fabrication.

• Mechanical fitout for 14 number semi-detached houses with Exhaust air heat pumps,340 litre submersible booster cold water storage tanks, semi rigid ducting from the EAHP, hot and cold water to all appliances in soldered copper, fusion weld soils and wastes and provision of fire extinguishers.

Dundoogan

• Mechanical fitout for 265 units

• Gas Central heating with modern efficiency boilers and thermostatically controlled radiators

• Central Demand Controlled Ventilation

•Solar PV panels